ADU plan check corrections

ADU plans get reviewed like a small house, so the correction letters tend to be long. Most comments fall into a few groups: fire separation, egress and alarms, utilities, energy, and structure. Here's what each one asks for and how to answer it.

Updated October 24, 2026 · By the Plan Check Correct team · General information, not legal or engineering advice. Requirements vary by jurisdiction.

Code sections below refer to the model International Residential Code (IRC). California uses the California Residential Code (CRC), which follows the same numbering with state changes, and state ADU law starts at Government Code section 66314. Confirm what your jurisdiction adopted.

Site plan and zoning

The free site plan maker draws the ADU, main house, setbacks and distances to scale.

Fire separation

Egress, alarms and habitability

Got a correction letter right now?Upload it and get every item explained in plain English, a drafted response, clouded plans and a checklist. Free during early access.

Answer my corrections

Garage conversions

Utilities

Energy

Structure

California rules that limit what a city can require

State ADU law (Government Code section 66314 and the sections after it) overrides many local rules. A few that come up in plan check:

HCD's ADU Handbook explains these rules in plain language. If a comment seems to conflict with them, raise it politely with the reviewer and cite the section.

Frequently asked questions

How many rounds of plan check does an ADU usually take?

One or two is common. The number depends mostly on how complete the first submittal is. Using your city's ADU checklist, or a pre-approved ADU plan if your city offers one, cuts down on comments.

Can the city require things that aren't in the code?

Cities can apply their own zoning and development standards, but in California the standards for ADUs have to be objective and can't be stricter than state ADU law allows. If a comment cites a local rule, ask for the specific ordinance section. If it seems to conflict with state law, the California Department of Housing and Community Development (HCD) publishes an ADU Handbook that explains what cities can and can't require.

Do prefab ADUs still get plan check corrections?

Yes, usually fewer. The factory-built unit may already be approved, but the local department still reviews the site plan, setbacks, foundation, anchorage, utility connections and fire separation.

Does a JADU need its own entrance?

In California, yes. A junior ADU is up to 500 square feet within a single-family home, needs an entrance separate from the main entrance to the house and at least an efficiency kitchen, and can share a bathroom with the main house.

Sources

Common plan check corrections and how to fix themThe comments reviewers write most often, by permit type, and what to change on your plans.Solar permit plan check correctionsComments on PV, battery storage and solar pool heating permits, and what to change on the plans.How to respond to plan check correctionsA step-by-step guide to answering a correction letter and getting approved on the next review.How to write a plan check response letterA fill-in template and sample responses a reviewer can check off quickly.Revision clouds and deltas for permit resubmittalsHow to mark plan changes so the reviewer finds them, and when last round's clouds come off.Answer my correctionsUpload a correction letter and get drafted responses, clouded plans and a checklist.